
Project News
Work begins on the redevelopment of Wellfield Academy in Leyland
by Imran Kassim
Director, Architecture
We're delighted to share that work has started on site at Wellfield Academy, one of the five national pathfinder schools in the UK part of the GenZero initiative.
Developed through the Department for Education (DfE) GenZero research project, led by Mott MacDonald, the programme is helping to shape a new benchmark for sustainable school design. It explores how net zero carbon schools can be delivered efficiently, using standardised approaches while creating healthier, nature-connected environments that support the UK’s 2050 net zero ambitions.
At Wellfield Academy, we designed the redevelopment around wellbeing and a strong connection to nature. The new buildings, conceived as a cross-laminated timber structure, replace the existing school on the same site, bringing together a two-storey commons block and a three-storey teaching block. A first-floor bridge links the two, creating a layout that feels connected, intuitive and easy to navigate.
Every space has been considered through a biophilic design lens. Classrooms will have clear views out to greenery, supported by natural ventilation and a calm, muted palette of materials that help create a more relaxed and focused learning environment. Renewable energy technologies are integrated throughout the scheme, supporting both environmental performance and long-term sustainability.
Outdoor learning is a key part of the design. A covered external classroom allows teaching to continue in all seasons, while new sports provision and a central courtyard create opportunities for play, socialising and quiet reflection. These spaces are designed to support concentration, reduce stress and encourage positive wellbeing across the whole school community.
The project is being delivered in phases to minimise disruption and maintain continuity for students and teachers throughout construction. Once complete, it’ll provide:
- 900 student places
- Flexible classrooms
- Main hall and activity studio
- Grass sports fields
- Landscaped courtyard
- Outdoor classroom
- Outdoor dining areas.
We’re looking forward to working alongside Kier and seeing the school progress on site. Make sure you’re following our social media channels, LinkedIn and Instagram, for regular project updates.
Discover more about Wellfield Academy and the concept behind its sustainable, future-ready design here
Frequently asked questions
The GenZero initiative is a Department for Education (DfE) research programme exploring how to deliver net zero carbon schools in operation. It focuses on standardised, efficient design approaches that also improve wellbeing and connection to nature.
AHR is delivering two of the five GenZero pathfinder schools: Wellfield Academy in Leyland and Woodside Primary School in Hertfordshire.
It means the building is designed to minimise energy use and is powered by renewable or low-carbon energy sources, so that its day-to-day running emissions are effectively zero.
We've adopted biophilic design principles, including natural materials, views of greenery and access to outdoor learning spaces. These features are known to help reduce stress, improve focus and support a healthier learning environment.
The project is being delivered in phases, allowing the school to remain operational while work takes place, with disruption carefully managed to protect day-to-day learning.
Posted on:
Jul 24th 2026
Topics:
Share on
Related Projects

Woodside Primary School
A single storey primary school that will provide children with calm, light-filled spaces to learn and grow, and one of five pioneering GenZero national pathfinder schools from the DfE.

Winterstoke Hundred Academy
Providing 900 secondary school places, this high quality, flexible learning environment is Somerset’s first net zero carbon in operation school.

High School Leckhampton
A 900-place net zero carbon in operation secondary school in Cheltenham, with a landscape-led design that respects the school's rural surroundings.
Related News

Planning approval secured for the GenZero Woodside Primary School in Hertfordshire
Project News
19 Mar 26

Net zero and the future learning estate: Embedding GenZero principles through CF25 delivery
Thought Leadership
19 Feb 26

GenZero and nature-based design in practice: Reflections from Education Estates 2025
Project News
19 Oct 25



