Skip to main content

Barnsley Metrodome, Reception

South Yorkshire, UK

AHR LesiureCentre BarnsleyMetrodome BuildingConsultancy Barnsley 01
AHR LesiureCentre BarnsleyMetrodome BuildingConsultancy Barnsley 02
AHR LesiureCentre BarnsleyMetrodome BuildingConsultancy Barnsley 03
AHR LesiureCentre BarnsleyMetrodome BuildingConsultancy Barnsley 05
AHR LesiureCentre BarnsleyMetrodome BuildingConsultancy Barnsley 04

PROJECT OVERVIEW

Enhancing the visitor experience at a popular leisure venue

To improve the complex for visitors, we were appointed to lead a comprehensive refurbishment and remodelling scheme at Barnsley Metrodome on behalf of Barnsley Premier Leisure (BPL).

Opened in 1989, the Metrodome is a popular sports and leisure centre and home to the well-loved Calypso Cove Waterpark – a collection of pirate themed slides, flumes, diving boards and interactive features.

The security entrance gates within the interior of the refurbished Barnsley Metrodome reception, with novelty pirate themed props, signage and wall graphics.
Brightly coloured seating and tables on the mezzanine level within the refurbished Barnsley Metrodome reception, with glazed balustrade and exposed brickwork.
Internal view across the cafe of the refurbished reception with natural daylight coming through the doors and windows.
The bright reception area within the refurbished Barnsley Metrodome, with coloured columns and floor to ceiling windows providing views onto the swimming area.
The bright reception area within the refurbished Barnsley Metrodome, with café facilities, coloured detailing, floor to ceiling windows and exposed brickwork.
The café facilities within the bright reception area within the refurbished Barnsley Metrodome, with roof lighting and wooden detailing.
The bright reception area within the refurbished Barnsley Metrodome, with coloured columns and floor to ceiling windows providing views onto the swimming area.
The café facilities within the bright reception area within the refurbished Barnsley Metrodome, with roof lighting and wooden detailing.
The modern, bright toilet facilities within the refurbished Barnsley Metrodome reception, with wooden flooring.
The bright reception area within the refurbished Barnsley Metrodome, with coloured columns and floor to ceiling windows providing views onto the swimming area.
Tables and coloured chairs within the bright reception area of the refurbished Barnsley Metrodome, with café facilities, wooden detailing, roof lights and exposed brickwork.

Enhanced entrance area welcomes visitors

A bright space to eat and drink

Dine in natural light from the atrium

Brightened walls invite visitors

Coloured furniture refreshes the space

An open plan space with plenty of seating

Glazing welcomes in light from the pool

Visitors can enjoy a new servery area

Upper ground floor WCs are renewed

Glazed poolside partitions brighten the space

Enhanced catering facilities

new facilities

Remodelling and refurbishment to create a welcoming space

The new reception, which takes the place of Calypso Café, now provides a welcoming entrance for visitors, while staff at the centre benefit from a revamped workspace with a new accessible compliant desk, back office with air conditioning, circulation space, poolside glazed partitions, fire doors and floor coverings.

Enhancing the complex’s catering facilities, and ensuring previous cafe services are not lost, a new servery area has been provided to the upper ground floor entrance, replacing the old reception space and offering leisure-users a variety of food and drink options.

Alongside the reception and servery works, facilities at the centre were further enhanced through the delivery of full refurbishment works to the upper ground floor toilets, including new cubicles and sanitaryware, floor and wall finishes, and mechanical and electrical upgrades throughout. Safety has also been enriched with replacement fire doors.

AHR LesiureCentre BarnsleyMetrodome BuildingConsultancy Barnsley FW

strategic planning

A collaborative approach to ensuring minimal disruption

To accommodate the relocation of the reception area from the upper ground floor to the lower ground floor, demolition and strip out works were undertaken at the beginning of the construction phase, including mechanical and electrical services.

Protecting our client’s revenue, we ensured the centre could remain fully operational throughout the works, whilst safeguarding visitors and staff at all times.

This was achieved through the careful planning and phasing of the works, with work areas kept separate from the public and essential facilities, such as first aid, uninterrupted throughout. We also reviewed and managed the health and safety of the site during the scheme in our role as Principal Designer for CDM.

Working collaboratively with principal contactors, NU Construction, and structural engineers, Alan Johnston Partnership, the project was delivered to budget, with the new facilities opening in time for our client’s busiest time of the year – the beginning of the school summer holidays!

Team

Meet the team behind the project

Contact

Interested in
learning more?

Learn more about 'Barnsley Metrodome, Reception' and other projects by reaching out to one of our team

Get in touch