AHR SECTORS
TRANSPORTATION

CYCLE CENTRES & MODULAR HUBS

  • THE PRACTICE DEVELOPED CONCEPTS FOR NEW BESPOKE CYCLE CENTRES FOR SITES INCLUDING ALTRINCHAM AND BOLTON, AS WELL AS REFURBISHMENT OPTIONS AND SMALLER MODULAR FACILITIES THAT COULD BE TAILORED IN SIZE AND ARRANGED TO FIT A VARIETY OF SITES.
  • A standard ‘kit of parts’ was developed for each facility including racks, retail / maintenance facility requirements, locker requirements and shower / changing provisions. The Practice was quickly able to develop options for the site and worked with the cost consultant in developing an outline cost plan for each scheme.

DOWNLOADS

PEOPLE

MICHAEL WALTERS

Director

MODULAR BENEFITS FOR RESIDENTIAL
DAVID DE SOUSA

NEWS
  • Building Consultancy Reappointed to Historic England Framework

  • 01 APRIL 2015

  • READ MORE >

THE EXCHANGE

THE HARD INTERCHANGE

  • WHAT COULD RAPID CAPTURE DO FOR YOU?